Lockout tagout and permit to work software.

    Manage every lockout and permit from start to sign-off. Use one product, or both together.

    Built for the highest-stakes regulated industries
    Pharmaceutical & Life SciencesMedical DeviceData CentersManufacturingHeavy Industry & EnergyConstruction & ProjectsFood & Beverage

    Lockout tagout

    Manage every part
    of lockout tagout.

    Procedures, live lockouts, sign-on, closeout and audit trail, all handled digitally.

    Permit to work

    Issue, sign and manage permits digitally.

    Your forms and approval rules, from request to handback.

    Lockout tagout and permit to work.
    Done right.

    EHS suites do a bit of everything. We do these two properly, on their own or together.

    Need both together?

    Our lockout tagout and permit to work software is designed to work hand in hand. Use both, and they run together as one job.

    LiveSite/Ballylin Dairy · Production Building9 signed on
    Dairy plant layout drawing with permits pinned on the equipment they apply to
    StatusActiveOn hold· isolations appliedIdle
    Dairy plant layout drawing with permits pinned on the equipment they apply to
    See it working

    See it on one of your own procedures or permits.

    Bring one lockout procedure or one permit form. We'll show you how it runs in Zentri, from start to sign-off.