Pharma and life sciences

    Lockout tagout and permit to work software for pharma.

    Every job is done to procedure and leaves a complete record. Your teams can see what work is happening on site.

    Use one product, or both together.

    A permit on a phone: Inspect Bioreactor 310, confined space, waiting for approval. Its lockout plan, LO-BR310-07, shows the agitator drive, N2 inlet valve and CIP supply valve locked.
    See it in action

    Watch a vessel entry from start to sign-off.

    30 seconds. The permit, the lockout and the site view, on one job.

    To procedure

    Every job is done to procedure.

    Pharma runs on procedures. Zentri makes sure the work follows them, one step at a time.

    A procedure for every piece of equipment

    Each lists every energy source and every isolation point, from electrical to clean steam.

    Steps in order

    Crews follow the steps on a phone, one isolation at a time.

    Verified before work starts

    Each isolation is checked and recorded. A second person confirms where you require it.

    Checks built into the permit

    A permit cannot be authorized until its isolations are verified. Expired training blocks sign-on.

    OSHA issued $21.9 million in lockout tagout penalties in one year. 7 in 10 citations were for procedures, training and periodic inspections.

    Source: Zentri analysis of 4,771 OSHA citations, FY2025.

    The record

    Every job leaves a complete record.

    Who approved it, who signed on, what was isolated, how it was verified and when it was handed back. The record builds as the work happens, so nobody has to piece it together afterwards.

    We analyzed 4,771 OSHA lockout tagout citations. Most weren't cited for missing controls. They were cited for missing proof.

    Visibility

    See what work is happening on site.

    Operations, maintenance and EHS see the same live view of every permit and lockout. Everyone knows what is being worked on, which makes the site safer for the people on it.

    What is live now

    Every active permit and lockout, by area and equipment.

    Who is signed on

    Each worker and contractor on every job.

    What is coming next

    Upcoming and suspended jobs, so work does not clash.

    On your own site plan

    LiveSite shows all of it on your layout drawing.

    LiveSite on a phone: Upstream Suite level 2, with Bioreactor 310's vessel entry on the plan, Harry inside and Jack at the manway. Its live sheet is lifted out: work by Harry and Jack in progress, lockout LO-BR310-07 isolated, permit to work PTW-2026-0217 authorized.
    Where it is used

    From a single pump to a full shutdown.

    Production lines

    Lock out a line right the first time.

    When a filling or packaging line stops for maintenance, production is waiting. Each machine has its own procedure, ready to use. Crews follow the steps and verify each isolation, so work starts sooner and nothing is missed.

    Vessels and clean utilities

    Enter a vessel only when every check is done.

    Vessel entry needs isolations, a gas test and a trained crew. The entry permit cannot be authorized until the isolations are verified. The gas test is recorded on the permit, and expired training blocks sign-on.

    Shutdowns

    Keep a shutdown on schedule.

    A shutdown puts many contractors and many jobs on site at once, with a fixed restart date. Every lockout and permit is checked again at each shift change, so the next shift knows what is open and what is closed.

    Everything it covers

    Lockout tagout and permit to work for pharma sites.

    • Equipment lockout procedures

      A procedure for each piece of equipment: filling lines, packaging lines, skids, mixers and bioreactors. Each lists its energy sources and isolation points.

    • Clean utilities

      Isolations for WFI, clean steam, compressed air and process gases, listed on the procedure with everything else.

    • Step-by-step lockouts

      Crews follow the steps in order on a phone and verify each isolation before the next. A second person confirms where you require it.

    • Sign-on and shift handover

      See who is signed on to every lockout and permit. Both are checked again at every shift change.

    • Testing and restart

      Take locks off for testing and put them back, with a record. Close the job only when everyone is clear.

    • Permits

      Confined space, hot work, work at height, electrical and your own permit types. Built on your forms and approval rules.

    • Checks before work starts

      A permit cannot be authorized until its isolations are verified. Gas tests are recorded on the permit, and expired training blocks sign-on.

    • One record

      Every action is captured with the person and the time. Export it for audits and periodic inspections.

    Built for the people who run the work.

    Operations

    Know what is locked out and when it comes back.

    Maintenance

    The right procedure for the job, every time.

    EHS

    Sign-on, verification and closeout, all recorded.

    Contractors

    One way of working, the same as your own crews.

    Quality

    A complete record of every job, ready when you need it.

    Site-based pricing

    Priced per site.

    One price for the whole site. Every crew and contractor can sign on.

    Sites live in 4 to 6 weeks. We import your procedures, rebuild your permit forms and train your first crews.

    Book a demo

    Your procedures and forms, imported

    Bring what you have. We load it for you.

    Integrations available

    Custom integrations with your CMMS and other systems.

    Contractors included

    Contractors sign on like your own crews, at no extra cost.

    Questions from evaluators

    Pharma questions, answered plainly.

    See it working

    See it on one of your own procedures or permits.

    Bring one lockout procedure or one permit form. We'll show you how it runs in Zentri, from start to sign-off.