Lockout tagout and permit to work software for pharma.
Every job is done to procedure and leaves a complete record. Your teams can see what work is happening on site.
Use one product, or both together.

Watch a vessel entry from start to sign-off.
30 seconds. The permit, the lockout and the site view, on one job.
Every job is done to procedure.
Pharma runs on procedures. Zentri makes sure the work follows them, one step at a time.
A procedure for every piece of equipment
Each lists every energy source and every isolation point, from electrical to clean steam.
Steps in order
Crews follow the steps on a phone, one isolation at a time.
Verified before work starts
Each isolation is checked and recorded. A second person confirms where you require it.
Checks built into the permit
A permit cannot be authorized until its isolations are verified. Expired training blocks sign-on.
OSHA issued $21.9 million in lockout tagout penalties in one year. 7 in 10 citations were for procedures, training and periodic inspections.
Source: Zentri analysis of 4,771 OSHA citations, FY2025.
Every job leaves a complete record.
Who approved it, who signed on, what was isolated, how it was verified and when it was handed back. The record builds as the work happens, so nobody has to piece it together afterwards.
We analyzed 4,771 OSHA lockout tagout citations. Most weren't cited for missing controls. They were cited for missing proof.
See what work is happening on site.
Operations, maintenance and EHS see the same live view of every permit and lockout. Everyone knows what is being worked on, which makes the site safer for the people on it.
What is live now
Every active permit and lockout, by area and equipment.
Who is signed on
Each worker and contractor on every job.
What is coming next
Upcoming and suspended jobs, so work does not clash.
On your own site plan
LiveSite shows all of it on your layout drawing.

From a single pump to a full shutdown.
Lock out a line right the first time.
When a filling or packaging line stops for maintenance, production is waiting. Each machine has its own procedure, ready to use. Crews follow the steps and verify each isolation, so work starts sooner and nothing is missed.
Enter a vessel only when every check is done.
Vessel entry needs isolations, a gas test and a trained crew. The entry permit cannot be authorized until the isolations are verified. The gas test is recorded on the permit, and expired training blocks sign-on.

Keep a shutdown on schedule.
A shutdown puts many contractors and many jobs on site at once, with a fixed restart date. Every lockout and permit is checked again at each shift change, so the next shift knows what is open and what is closed.
Lockout tagout and permit to work for pharma sites.
Equipment lockout procedures
A procedure for each piece of equipment: filling lines, packaging lines, skids, mixers and bioreactors. Each lists its energy sources and isolation points.
Clean utilities
Isolations for WFI, clean steam, compressed air and process gases, listed on the procedure with everything else.
Step-by-step lockouts
Crews follow the steps in order on a phone and verify each isolation before the next. A second person confirms where you require it.
Sign-on and shift handover
See who is signed on to every lockout and permit. Both are checked again at every shift change.
Testing and restart
Take locks off for testing and put them back, with a record. Close the job only when everyone is clear.
Permits
Confined space, hot work, work at height, electrical and your own permit types. Built on your forms and approval rules.
Checks before work starts
A permit cannot be authorized until its isolations are verified. Gas tests are recorded on the permit, and expired training blocks sign-on.
One record
Every action is captured with the person and the time. Export it for audits and periodic inspections.
Also available: Safety Observations.
Book a demoBuilt for the people who run the work.
Know what is locked out and when it comes back.
The right procedure for the job, every time.
Sign-on, verification and closeout, all recorded.
One way of working, the same as your own crews.
A complete record of every job, ready when you need it.
Priced per site.
One price for the whole site. Every crew and contractor can sign on.
Sites live in 4 to 6 weeks. We import your procedures, rebuild your permit forms and train your first crews.
Book a demoYour procedures and forms, imported
Bring what you have. We load it for you.
Integrations available
Custom integrations with your CMMS and other systems.
Contractors included
Contractors sign on like your own crews, at no extra cost.
Pharma questions, answered plainly.
Yes. We import your procedures and rebuild your permit forms, so it works the way your site already does.
Who approved it, who signed on, what was isolated, how it was verified and when it was handed back, with times.
Everyone you give access to. Operations, maintenance and EHS see the same live view of every permit and lockout.
Yes. Contractors sign on like your own crews, at no extra cost.
Yes. Lockout tagout and permit to work each work on their own. You can add the other later.
4 to 6 weeks. We import your procedures, rebuild your permit forms and train your first crews.
One price per site. Every crew and contractor can sign on.
See it on one of your own procedures or permits.
Bring one lockout procedure or one permit form. We'll show you how it runs in Zentri, from start to sign-off.