Manage every part of lockout tagout.
From writing the procedure to the periodic inspection, and every step in between.
Works on its own. Add Permit to Work when you need it.

| Equipment | Status | Role |
|---|---|---|
| Conveyor A1 | Active | Owner |
| Pump B2 | Approval | Verifier |
| Boiler 3 | Draft | Approver |
Signed — J. Smith · 09:42
Signed — J. Smith · 09:48
Everything lockout tagout, in one place.
Before Procedure
- Procedures one for each machine
- Equipment see what is locked out
- Tags made in the same system
- ImpactView see what goes down first
During Execution
- Live lockouts steps followed in order
- Sign-on who is on every job
- Shift verification checked every shift
- Temporary removal locks off for testing
After Evidence
- Closeout when everyone is clear
- Reports every lockout filed
- Audit trail every action captured
- Periodic inspections as OSHA requires
Most lockout tagout tools stop at the procedure.
Book a LOTO demoProcedure. Execution. Evidence.
Procedure control.
Create controlled, equipment-specific LOTO procedures that stay connected to the work they support.
Equipment-linked procedures
Tie each procedure to the right asset, energy sources and isolation points.
Approval and version control
Keep procedure status, approvals and revisions visible.
Execution-ready requirements
Define checks, verification steps and required fields before work begins.
Templates and tagging
Standardize rollout across sites and link records to equipment in the field.
- Electrical · 480 V · 3-phaseMCC-B-12 breaker
- Steam · 150 psiBlock valve V-7
- Hydraulic · 1 800 psiIso valve HV-3
Execution control.
Execute approved lockout plans from your mobile device, on the floor, following the right steps in the right order.
Worker sign-on
See who is working under each active lockout.
Group LOTO visibility
Track internal teams, contractors and shift changes.
Isolation and verification
Guide teams through required steps and capture evidence as work happens.
Controlled closeout
Confirm workers are clear, post-checks are complete and the job is ready to close.
Evidence control.
Keep a connected record of what happened, who was involved and how the work was closed out.
Audit trail
Capture each action with user, time and context.
Completed plan records
Review completed lockouts by procedure, equipment, worker, site or date.
Closeout evidence
Retain sign-off, verification and closeout records in one place.
Built-in auditing
Audit training records and procedures to confirm they’re still correct. Track review status, findings and overdue items.
See what goes down before you isolate.
ImpactView shows everything fed by the equipment you are about to lock out, so nothing switches off by surprise.
Equipment · Single-lineImpactViewThe controls behind a scalable LOTO program.
Manage users, roles, sites, notifications and exports behind every procedure, plan and review.
We analyzed 4,771 OSHA lockout tagout citations.
Most weren't cited for missing controls. They were cited for missing proof.
Priced per site.
One price for the whole site. Every crew and contractor can sign on.
Sites live in 4 to 6 weeks. We import your existing procedures and equipment list, and train your first crews.
Book a LOTO demoYour procedures, imported
Bring what you have. We load it for you.
Integrations available
Custom integrations with your CMMS and other systems.
Contractors included
Contractors sign on like your own crews, at no extra cost.
Guides and templates.
Start with a free template
Download a free, OSHA-aligned lockout tagout procedure template in PDF, Word or Excel before you digitize the whole process.
Lockout tagout software, answered plainly.
Yes. Lockout tagout works on its own. You can add Permit to Work later.
Digital lockout tagout software replaces paper LOTO procedures, forms and binders with one system: procedures are created and approved digitally, executed step by step from a mobile device, and every sign-on, verification and closeout is recorded automatically. Zentri covers every part of lockout tagout, from procedure control through live execution to audit evidence and periodic review.
Zentri structures LOTO work around the elements OSHA 1910.147 expects: equipment-specific energy control procedures, worker sign-on, isolation verification and a complete record of who did what and when. Evidence is captured as the work happens, so periodic reviews and inspections draw on live records instead of reconstructed paperwork.
Yes. Procedures are built as controlled, equipment-specific templates covering each energy source and isolation point. Published procedures are versioned, and a plan in execution keeps the content it started with while improvements roll out to new work.
Every worker signs on to the lockout plan individually, and the plan shows who is currently signed on in real time. Closeout accounts for every signed-on worker, which keeps multi-person and multi-shift lockouts visible and controlled instead of tracked on a clipboard.
Isolation points are verified at the equipment during execution, with QR code scanning to confirm the right point and second-person verification where your process requires it. Each verification is recorded against the plan with the person and time.
Yes. Existing procedures can be rebuilt as digital templates, and equipment and isolation point registers replace spreadsheet tracking. Teams keep the structure of their current process; the paperwork, filing and manual cross-checking are what disappear.
Lockout/Tagout controls hazardous energy; Permit to Work authorizes the scope of work. In Zentri they stay separate records with their own governance, linked through the same Job so coordinators see permit and isolation readiness together and can coordinate holds when conditions change.
Yes. Procedure templates, roles and workflows are managed centrally and applied per site, so each facility runs the same controlled process while keeping its own equipment, procedures and records.
Every material action on a lockout plan is recorded: procedure approvals, worker sign-ons, isolation verifications, status changes and closeout, each with the person and timestamp. Evidence can be reviewed per plan or per piece of equipment and exported for audits and periodic review.
See it on one of your own procedures.
Bring one lockout procedure. We'll show you how it runs in Zentri, from start to sign-off.

