Digital lockout tagout software

    Manage every part of lockout tagout.

    From writing the procedure to the periodic inspection, and every step in between.

    Works on its own. Add Permit to Work when you need it.

    Zentri
    Zentri
    Dashboard
    Dashboard
    Boiler plant · Shift A
    Lockout in progress
    Boiler-3 Shutdown
    6 of 16 isolation points
    Continue
    Active
    12
    2 overdue
    Equipment
    42
    Approvals
    3
    This month
    28
    Operational 32Locked out 8
    Active plans
    EquipmentStatusRole
    Conveyor A1ActiveOwner
    Pump B2ApprovalVerifier
    Boiler 3DraftApprover
    Shortcuts
    New plan
    Inbox3
    Reports
    9:41•••
    ‹
    Boiler-3 Shutdown
    LO-2026-0184
    54%
    Pre-check 5/5 ✓
    Isolation 2/5
    Post-check 0/3
    ✓
    #1Electrical panel A3

    Signed — J. Smith · 09:42

    3/3
    ✓
    #2Pneumatic valve V-102

    Signed — J. Smith · 09:48

    3/3
    #3Hydraulic disconnect HD-3
    1/3
    #4Cooling water CW-7
    0/3
    #5Steam valve SV-22PV
    0/4
    Verify isolation
    See it in action

    Watch Zentri manage lockout/tagout from start to sign-off.

    Everything we do

    Everything lockout tagout, in one place.

    1. Before Procedure

      • Procedures
      • Equipment
      • Tags
      • ImpactView
    2. During Execution

      • Live lockouts
      • Sign-on
      • Shift verification
      • Temporary removal
    3. After Evidence

      • Closeout
      • Reports
      • Audit trail
      • Periodic inspections

    Most lockout tagout tools stop at the procedure.

    Book a LOTO demo
    How we control it

    Procedure. Execution. Evidence.

    Stage 01

    Procedure control.

    Create controlled, equipment-specific LOTO procedures that stay connected to the work they support.

    Equipment-linked procedures

    Tie each procedure to the right asset, energy sources and isolation points.

    Approval and version control

    Keep procedure status, approvals and revisions visible.

    Execution-ready requirements

    Define checks, verification steps and required fields before work begins.

    Templates and tagging

    Standardize rollout across sites and link records to equipment in the field.

    Procedure · v4.2
    ✓ Approved
    Boiler-3 Shutdown
    Bldg A · Floor 2 · Steam boiler
    Energy sources
    • Electrical · 480 V · 3-phase
      MCC-B-12 breaker
    • Steam · 150 psi
      Block valve V-7
    • Hydraulic · 1 800 psi
      Iso valve HV-3
    5Isolation points
    8Verification steps
    3Pre-checks
    Approved by
    K. Mendez
    Date
    12 Mar 2026
    Stage 02

    Execution control.

    Execute approved lockout plans from your mobile device, on the floor, following the right steps in the right order.

    Worker sign-on

    See who is working under each active lockout.

    Group LOTO visibility

    Track internal teams, contractors and shift changes.

    Isolation and verification

    Guide teams through required steps and capture evidence as work happens.

    Controlled closeout

    Confirm workers are clear, post-checks are complete and the job is ready to close.

    Active Lockout Plan
    ● Active
    Boiler-3 Shutdown
    LO-2026-0184  ·  Bldg A · Floor 2
    Isolation progress
    3 / 5 verified
    ✓Pre-check complete08:14
    ●Iso point #3 · verifyingin progress
    Post-check pending
    Workers signed on
    JS
    MR
    KP
    LE
    4 / 4
    signed on
    Next action
    Verify MCC-B with QR scan
    Stage 03

    Evidence control.

    Keep a connected record of what happened, who was involved and how the work was closed out.

    Audit trail

    Capture each action with user, time and context.

    Completed plan records

    Review completed lockouts by procedure, equipment, worker, site or date.

    Closeout evidence

    Retain sign-off, verification and closeout records in one place.

    Built-in auditing

    Audit training records and procedures to confirm they’re still correct. Track review status, findings and overdue items.

    Audit Trail
    LO-2026-0184
    Procedure v4.2 used08:00
    4 workers signed on08:12
    Pre-check completed08:14
    Iso point #3 verified · QR scan08:24
    Photo evidence attached08:26
    Post-check completed09:02
    Plan closed09:08
    Evidence captured
    SignaturesPhotosQR verificationChecklist records
    Periodic review due
    2 procedures · this month
    Start review
    ImpactView

    See what goes down before you isolate.

    ImpactView shows everything fed by the equipment you are about to lock out, so nothing switches off by surprise.

    ZentriEquipment · Single-lineImpactView
    Main Switchgear
    MSB-01 · Plant Room
    Mechanical Panel MP-1
    Plant Room · 400V
    CRAH-01
    Hall 1 · B-side from MP-2
    CRAH-02
    Hall 1 · Row B
    CRAH-03
    Hall 1 · Row C
    PrimaryBackupLOTO In ProgressImpactedLive on B side onlyOperational
    Platform capabilities

    The controls behind a scalable LOTO program.

    Manage users, roles, sites, notifications and exports behind every procedure, plan and review.

    Why this matters

    We analyzed 4,771 OSHA lockout tagout citations.

    Most weren't cited for missing controls. They were cited for missing proof.

    Site-based pricing

    Priced per site.

    One price for the whole site. Every crew and contractor can sign on.

    Sites live in 4 to 6 weeks. We import your existing procedures and equipment list, and train your first crews.

    Book a LOTO demo

    Your procedures, imported

    Bring what you have. We load it for you.

    Integrations available

    Custom integrations with your CMMS and other systems.

    Contractors included

    Contractors sign on like your own crews, at no extra cost.

    Questions from evaluators

    Lockout tagout software, answered plainly.

    See it working

    See it on one of your own procedures.

    Bring one lockout procedure. We'll show you how it runs in Zentri, from start to sign-off.