Permit to Work software

    Every permit. One job.
    Built together.

    Hot work, heights, confined space and lockout, all created and controlled as one.

    Product demo: a job is created in Zentri, a hot work permit, a working at heights permit and a lockout plan are selected and built into it, creating every record linked and visible on one job.

    Hot WorkConfined SpaceWorking at HeightsEnergized ElectricalYour own permit types

    Select. Build. Control.

    One flow from choosing the work to running it live.

    Select

    Pick the permits the job needs.

    Build

    Zentri builds them into one job.

    Control

    Run it live so everyone sees status.

    See the whole job

    Permits, isolations and crews on one live record.

    Jobs / JOB-2026-0418 · Mill Line 2 shutdown
    Search jobsSW
    Crusher conveyor overhaulActive
    JOB-2026-0418 · Mill Line 2 · Day 4 of 9
    Job recordPlace hold on job
    Linked records2 permits · 2 lockout plans
    Permits
    Hot work · Mill Line 2 walkwayPTW-2026-0771 · Gas test 09:40 · 3 signed onActive · to 18:00
    Confined space · Crusher chutePTW-2026-0774 · Entry attendant assignedApproved · 14:00
    Lockout plans
    Crusher Feed Conveyor CV-102LO-2026-0418 · LOTO-CV-102 v3.1 · 8 points8 of 8 verified
    Air Compressor AC-04LO-2026-0421 · Electrical · Pneumatic · Stored8 of 8 verified
    Linked observation
    Belt misalignment reported at CV-102OBS-2026-0355 · QR report · Mill Line 2Action assigned

    Your permits, not ours

    Rebuild your paper forms block by block, approvals and gas tests included.

    Drag in blocks

    Gas tests, PPE, isolation and sign-offs, assembled to match your form.

    Set the rules per type

    Approval roles, validity window and reassessment cadence per permit type.

    Publish versions

    Live permits keep the version they were built on, so edits never rewrite them.

    Know who's doing what

    Sign-on register

    Every crew member, internal or contractor, signs on to each permit.

    Signed approvals

    Every decision carries a name, a time and a signature.

    Training gates

    Expired training blocks a permit from issuing.

    Permit to Work + Lockout Tagout

    PTW and Lockout Tagout, connected.

    Two records on one thread. The permit's isolation block links the lockout plan, so authorization waits until every point is verified.

    Isolation plans are created, linked and controlled alongside your permits — in the same job.Explore Lockout Tagout →
    Questions from evaluators

    Permit to Work software, answered plainly.

    See it working

    See your permit process in Zentri.

    We'll show you a permit run end to end: request, approval, authorization, live control and closeout, and where Lockout/Tagout connects. Then we'll talk through how your permit workflows would fit.