Notes from the shop floor.
What we're learning about lockout tagout, permit to work and keeping compliance evidence straight, written by the team that builds the platform.

Permit to Work Software: Why Digital Is Now the Industry Standard
Discover why digital permit to work software is replacing paper. Cut downtime, boost safety, and stay compliant with a modern PTW system.
Aug 17, 2025 · 8 min read
OSHA's Top LOTO Violations in 2025 (and How Digital Compliance Solves Them)
Learn about the most common OSHA lockout/tagout violations, their costly penalties, and how digital compliance platforms can prevent citations and save lives.
Aug 18, 2025 · 7 min read
Digital PTW: The Ultimate Guide to Permit to Work Software (2025)
Thinking about a digital PTW system? Our definitive 2025 guide covers everything: what it is, benefits, ROI calculation, key features, industry use cases, and FAQs.
Aug 19, 2025 · 8 min read
Goarc vs. Zentri: Which Digital Safety System is Right for You?
Compare Goarc and Zentri digital safety platforms. Discover which compliance system fits your business needs for LOTO, permit-to-work, and safety management.
Aug 31, 2024 · 7 min read
The Hidden Costs of Paper-Based Lockout Tagout (and How a Digital System Is the Cure)
Paper-based LOTO drains time, increases risk, and creates compliance gaps. Discover how a digital lockout tagout system fixes hidden costs and improves safety.
Aug 31, 2025 · 10 min read
Digital Permit to Work: The End of Costly Delays and Compliance Gaps
Eliminate costly downtime and compliance risks with a digital permit to work system. Learn how Zentri's PTW software streamlines approvals and enhances safety.
Aug 31, 2025 · 7 min read
Build a Bulletproof Lockout‑Tagout Plan (And Why Digital Beats Paper)
Learn how to build an OSHA-compliant lockout-tagout plan with step-by-step procedures. Discover why digital LOTO beats paper and download our free isolation table template.
Oct 26, 2025 · 12 min readSee how Zentri fits your operation.
We'll show you how Zentri handles permits, isolations, roles and approvals. Then we'll talk through how it would run at your facility.