    DIGITAL LOCKOUT/TAGOUT · DATA CENTERS

    Prove LOTO control across uptime-critical data center work.

    Zentri centralizes procedures, worker sign-on, power dependency checks, isolation verification and closeout evidence in one traceable record.

    The problem

    LOTO control gets harder when every isolation can affect uptime.

    When data center LOTO spans facilities teams, contractors and critical power systems, disconnected records make it hard to prove what was isolated, whether redundancy remained intact and what was safe to release.

    Question
    • EQUIPMENTWhich asset is being isolated?
    • DEPENDENCYWhat downstream systems are affected?
    • REDUNDANCYIs the backup path still active?
    • WORKERSWho is signed on?
    • VERIFYWas isolation verified in the field?
    • STATUSWhat is still energized or at risk?
    • CLOSEOUTIs the asset ready to release?

    Zentri answers each question from one connected LOTO record.

    Featured capability

    See every dependency before you isolate.

    ImpactView maps the power chain from utility feed to rack, helping teams understand downstream impact before a lockout begins.

    ZentriEquipment · Power ChainImpactView
    B
    Utility Feed
    UTIL-001
    Operational
    Main Switchgear
    SWG-001
    Operational
    UPS-A · Primary
    UPS-A-01
    Operational
    PDU-A-01
    PDU-A-01
    Locked Out
    UPS-B · Backup
    UPS-B-01
    Operational
    Rack 01
    B-Side Active
    PrimaryBackupCarried by BackupLocked OutImpactedOperational
    Map A/B redundancy
    Define primary and backup feeds so teams can verify alternate paths before maintenance.
    Preview downstream impact
    See which racks, PDUs and systems may be affected before any isolation.
    Auto-generated diagrams
    Define relationships once and build interactive dependency views automatically.
    Real-time status
    See what is isolated, energized or potentially impacted during active work.

    Product workflow

    One traceable record from planning to release.

    Each step adds status, ownership and evidence to the same controlled lockout record.

    01
    Procedure
    Approved LOTO procedures linked to data center assets, energy sources and isolation points.
    02
    Plan
    Create lockout plans for maintenance windows, electrical work, commissioning or contractor activity.
    03
    Assess impact
    Review dependencies, redundancy paths and affected downstream systems before isolation.
    04
    Sign-on
    Record facilities teams, contractors and authorized workers under the lockout.
    05
    Verify
    Track isolation points, energy sources and field verification before work begins.
    06
    Monitor
    Keep active lockouts visible across plant rooms, white space, electrical infrastructure and shifts.
    07
    Release
    Capture closeout, sign-off, return-to-service status and the completed record.

    Use cases

    Built for data center LOTO scenarios.

    Electrical infrastructure maintenance

    Control LOTO for switchgear, UPS systems, PDUs, generators, transfer switches and supporting electrical assets.

    Critical electrical assets
    4 assets
    Switchgear MSB-ALOTO-MSB-A v3.0
    UPS-B-02LOTO-UPS-B-02 v2.1
    PDU-B-01LOTO-PDU-B-01 v2.8
    Generator GEN-03LOTO-GEN-03 v1.6
    Critical power path work

    Review dependencies and redundancy before isolating equipment that may affect downstream loads.

    Path before isolation
    APDU-A-01Active
    BPDU-B-01Planned lock
    Backup path verified before lock
    Contractor and vendor activity

    Keep external teams inside a controlled process with clear procedure access, sign-on, verification and closeout.

    Workers on plan
    RBR. Becker · Facilities
    MNM. Nakamura · EHS
    LEL. Erb · ABB Servicevendor
    HSH. Stein · ABB Servicevendor
    JKJ. Kraus · Eatonvendor
    Commissioning and project work

    Coordinate lockouts across new equipment, phased handovers, contractor teams and live operational areas.

    Hall 2 commissioning
    phase 3 / 4
    Phase 1Electrical · done
    Phase 2Mechanical · done
    Phase 3Energization · active
    Phase 4Live handover
    Multi-shift operations

    Maintain visibility when lockouts continue across handovers, maintenance windows or extended work activity.

    Shifts on this lockout
    9h on the lock
    Night22:00 → 06:00Active
    Early06:00 → 14:00Scheduled
    Late14:00 → 22:00Scheduled
    Multi-site standardization

    Apply consistent LOTO workflows across facilities while keeping site-specific equipment and procedures controlled.

    Sites on standard
    5 sites
    FRA-01Frankfurtaligned
    DUB-02Dublinaligned
    AMS-01Amsterdamaligned
    LON-03Sloughaligned
    MAD-01Madridrollout

    Connected record

    The record builds as the work happens.

    Every sign-on, dependency check, isolation step, verification and closeout action stays linked to the lockout record.

    Completed lockout record
    LO-2026-0521
    Ready to energize
    Lockout ID
    LO-2026-0521
    Site / Area
    Data Hall 2 · Electrical Room B
    Equipment
    PDU-B-01
    Procedure
    LOTO-PDU-B-01 · v2.8
    Energy sources
    Electrical · Stored energy
    Dependencies
    6 downstream racks
    Redundancy
    A-side path active
    Isolation points
    4 / 4 verified
    Workers signed
    2 facilities · 3 contractors
    Verification
    All checks complete
    Impact review
    Completed before isolation
    Release status
    Ready to energize
    Closeout
    Completed at 02:14
    Export
    Available
    Closed by R. Becker · 24 May 2026 · 02:14

    Before & after

    Replace paper coordination with traceable LOTO control.

    Paper process
    Zentri
    Procedure binders
    Procedures linked to assets and isolation points
    Static power drawings
    Interactive dependency view
    Manual redundancy checks
    Recorded impact review
    Contractor sign-on sheets
    Digital worker sign-on
    Control room updates
    Visible lockout status
    Handover notes
    Connected closeout record
    Audit prep from paper files
    Searchable LOTO history

    Same record, every team

    One record. Every team. Same status.

    Facilities / Engineering
    Sees active lockouts, dependency impact, isolation status and completed evidence.
    Operations / Control Room
    Knows what is isolated, what remains energized and what is ready to release.
    EHS
    Tracks worker sign-on, verification status and completed LOTO evidence.
    Contractors
    Work from the correct procedure with clear sign-on, scope and closeout requirements.
    Portfolio / Regional Teams
    Standardize LOTO control across sites while retaining local equipment detail.

    Prove LOTO control without risking visibility.

    See how Zentri helps data center teams manage lockout/tagout across critical power infrastructure, contractors, maintenance windows and live operations.