Lockout tagout and permit to work software for data centers.
See what an isolation will take down before you apply it. Manage every lockout and permit from start to sign-off.
Use lockout tagout on its own, or with permit to work.

See what goes down before you isolate.
ImpactView maps your power chain from utility feed to rack. Pick the equipment you plan to lock out and see everything it feeds, and whether the backup path is still live.
Then do the lockout safely.
Knowing what goes down protects the uptime. This protects the people doing the work.
Every energy source listed
Equipment fed from two sides can still be live. Each procedure lists every source and every isolation point.
Locked and tagged in order
Crews follow the steps on a phone, one isolation at a time.
Verified before work starts
Each isolation is checked and recorded. A second person confirms where you require it.
Everyone signed on
Each worker and contractor signs on to the lockout. It is closed only when everyone is clear.
From the first contractor on site to the hundredth maintenance window.
Control contractor work on a live construction site.
Issue permits for hot work, work at height, electrical and confined space work. Every contractor signs on to the permit they work under.
Keep commissioning on schedule.
Commissioning runs against the clock, with many trades on site at once. Zentri makes lockout plans quick to create and simple to carry out, and gives every team the same live view of what is locked out.
Do planned work without an unplanned outage.
Working out what an isolation will take down is slow and easy to get wrong. Zentri shows you before you start, so you can be sure.
More than half of major outages cost over $100,000. One in five cost over $1 million.
Source: Uptime Institute, Annual Outage Analysis 2026.
Lockout tagout and permit to work for data center work.
Electrical lockout procedures
A procedure for each piece of equipment: switchgear, UPS, PDUs, generators and transfer switches. Each lists its energy sources and isolation points.
ImpactView
Pick the equipment you plan to isolate and see everything it feeds. Plan the work without tracing single-line diagrams by hand.
A and B paths
Check the backup path is live before you take one side down, and see which racks run on one feed during the work.
Step-by-step lockouts
Crews follow the steps in order on a phone and verify each isolation before the next. A second person confirms where you require it.
Sign-on and shift handover
See who is signed on to every lockout. The lockout is checked again at every shift change.
Testing and re-energizing
Take locks off for testing and put them back, with a record. Close the job only when everyone is clear.
Permits
Electrical, hot work, confined space and work at height. Contractors and vendors sign on to the permit they work under.
One record
Every action is captured with the person and the time, from construction through operations. Export it for audits.
Also available: Safety Observations.
Book a demoBuilt for the people who run the work.
Know what is energized and what is locked out.
See the impact before every isolation.
Sign-on, verification and closeout, all recorded.
The right procedure, on the job, every time.
One way of working across every site.
Priced per site.
One price for the whole site. Every crew and contractor can sign on.
Sites live in 4 to 6 weeks. We import your equipment list, build your power chain and train your first crews.
Book a demoYour equipment list, imported
Your power chain is built from the list you already have.
Integrations available
Custom integrations with your CMMS and other systems.
Contractors included
Contractors sign on like your own crews, at no extra cost.
Data center questions, answered plainly.
Yes. Teams use it for permits and lockouts while a site is being built and commissioned, and keep using it in operations.
Everything fed by the equipment you plan to lock out, and whether the backup path is still live.
Yes. Contractors sign on like your own crews, at no extra cost.
Custom integrations are available. Tell us what you use.
Yes. Lockout tagout works on its own. You can add Permit to Work later.
4 to 6 weeks. We import your equipment list, build your power chain and train your first crews.
One price per site. Every crew and contractor can sign on.
See it on your own power chain.
Bring one single-line diagram or one lockout procedure. We'll show you how it runs in Zentri, from start to sign-off.